REFERENCES

References Ingrad Energo d.o.o

It is easy to realize the capacity of our company according to our references:

  • Public Enterprise ”Electric power industry of Serbia”, Power plants Panonske, Novi Sad - Maintenance of pipelines of low and high pressure
  • Public Enterprise ”Electric power industry of Macedonia”, Power plants Oslomej”, Kicevo - Replacement elbows RB line steam line, as a subcontractor, "EL-TE Engineering, Skopje
  • “Golden lady”, Italy, manufacturing plant “Valy”, Serbia - Design and installation of thermal power facilities, HVAC, and technological systems of gas production plant for the production of socks Loznica, 55000 m2
  • “Farmakom”, Sabac, Mines and smelters „Zajaca“, Loznica - Design, supply and installation of heavy oil plants - a complete system for storage of 300 tons, maintenance of transport and operating parameters of fuel oil
  • Public Enterprise ”Electric power industry of Serbia”, Power plants Panonske, Sremska Mitrovica - Maintenance of pipelines of low and high pressure
  • Public Enterprise ”Electric power industry of Serbia”, Hydro power plants Drinsko-Limske PLC, Hydropower “Mali Zvornik” - Delivery and installation of valve stations
  • "Hitachi", Germany, HK Walsum - Installation of gas reactors - DeNOx 2,3,4,5 and 6 HK Walsum 820 MW, as a subcontractor Th Arens, Germany
  • “Eastland engeenering” Ltd – London, Komsomolskoye Oil Field, Kazakhstan - Installation of equipment and oilfield pipe distribution
  • “Loznica gas”, Loznica - Design of gas distribution network 180 km with delivery and installation of steel pipelines
  • Public Enterprise “Urboplan”, Loznica - Design of thermo-technical and gas installations in public facilities, Loznica, a total of  8.000 m2
  • Public Enterprise “Banka Postanska Stedionica”, Serbia - Reconstruction of air conditioning and ventilation system at the headquarters of the bank, as a subcontractor "Via ocel”, Belgrade
  • Public utility company “Beogradske elektrane” - Execution of works on hot water pipes, as a subcontractor "Via ocel”, Belgrade
  • Public transport company “Belgrade”, The main garage Karaburma - Installation of ceiling heating panel with the pipeline network, as a subcontractor "Via ocel”, Belgrade
  • “Ruma guma”, Ruma - Maintenance of heating and steam mains manufacturing plant, as a subcontractor "Via ocel”, Belgrade
  • “Farmakom”, Sabac, Administration building in Sabac, Loznica and Zajaca - Design, supply and installation of heating and cooling office buildings, a total of 5100 m2
  •  “Forma ideale”, Kragujevac, manufacturing plant in Kragujevac - Detailed design of the manufacturing plant to produce 17.000 m2 of panel furniture
  • Public Enterprise, Agency for Commercial Space of  Belgrade - Design of heating and cooling office space in Belgrade, a total of 6.200 m2
  • “Forma ideale”, Kragujevac, retail facilities Nis, Jagodina, Beograd - Designing with delivery and installation of central air conditioning system, a total of 5.200 m2
  • Public Enterprise ”Electric power industry of Serbia”, Hydro power plants Drinsko-Limske PLC, Hydropower “Mali Zvornik” - Delivery and installation of central heating installations
  • Public Enterprise ”Electric power industry of  Macedonia”, Power plants Bitola - Repair works on fan of mills, canals supplying coal in the boilers and high pressure pipeline, as a subcontractor, "EL-TE Engineering, Skopje
  • “Alumil”, Greece, plant for production of aluminum profiles “Alpro”, Vlasenica, Bosnia - The main project the energy conversion boiler and  technological consumers with light heating oil or el. energy on LPG, with LPG warehouse 100 m3
  • “Energoinvest”, Sarajevo, plant for production of switching equipment “RAOP”, Lukavica, Bosnia - The main project for LPG distribution center with warehouse 300 m3
  • “Loznica gas”, Loznica - Design of reconstruction of the Main metering and regulating stations Loznica 1(15.000 m3/h) and reconstruction of the Main metering and regulating stations Loznica 2 (15.500 m3/h)
  • “Farmakom”, Sabac, Mines and smelters „Zajaca“, Loznica - Design, manufacture, supply and installation of thermal power block

Other important partners in terms of design and performance of thermotechnical installations (heating, cooling, ventilation and hot water preparation):

Criminal Bureau fix "Foca"-Bosnian; Public utility company "Drina", Mali Zvornik; Public utility company “Zvornik stan”, Zvornik; “Birac Glinica”, Karakaj, as a subcontractor  “Termoelektro", Brcko; Health Center “Dr. Milenko Marin" , Loznica;  "MTK Omorika” Han Pjesak ; Mining and energy plant "Bitola" Macedonia, as a subcontractor, "EL-TE Engineering”, Skopje; Hotel “Rojal Spa” ,Banja Koviljača; Healt Center - KBC” Zvezdara “ Beograd; General Hospital – Loznica ; Kindergarten  “Bambi” , Loznica.

“Fabrika Automobila Srbija ” – Kragujevac, Srbija

  • Participation in the reconstruction and construction of facilities within the Fiat Automobiles Serbia implemented through a partnership with the Italian company Italianacostruzione spa, Roma srl Italappalti
  • Massafra and German partner Eisenmann Hemmingen.
  • Implementation of the contract designed and installed the following systems
  • Power supply of natural gas to consumers in the paint shop (capacity 3500 Nm3 / h)
  • Drain the rain and sewage water to spread paint shop and assembly
  • Power-robotic system for preparation of body water cooling welding equipment and compressed air for pneumatic drive robot (system KOMAU)
  • Extraction of exhaust air (welding products) with robotic systems for welding body (system KOMAU). A total of 20 separate units, each accommodate 25000-45000 m3 / h
  • Mechanical Plant Maintenance of underground water capacity of 10 l / s
  • Mechanical installations at the facility ECO park for disposal or further transfer pressed scrap material.

ABOUT US

Logo Ingrad Loznica

“INGRAD ENERGO” is the enterprise with its basic activity of engineering on thermo-energetic objects, thermo-technical and gas installations. This means the phases, starting from proposing the decisions, over the production of the project-technical documentation and installation to maintenance of the system in exploitation.Read more.